Renovation of Container Terminal Control Room
Located on the ground floor of the Muara Container Terminal gate building, the control room has been temporarily relocated to the second floor of the building. This is to allow for renovations to be carried out on the ground floor of the building. Once completed, the control room will occupy the entire ground floor including the space once utilised by the billing office.